Skip to content

Skip Hire for a Kitchen Renovation

A kitchen renovation usually needs a 4 yard midi skip. It takes the units, worktops, flooring and tiling a standard refit produces, with enough room left for packaging from new appliances - a full-house renovation that includes the kitchen is the main case where you would size up to an 8-yard instead.

Our recommendation

4 Yard Skip (Midi skip)

Kitchens generate a mix of bulky-but-light waste (cabinets, worktops) and heavier material (tiles, old flooring), which is exactly what a midi is sized for. If the job is only a partial refit - new worktops and appliances, cabinets staying - a mini is often enough; if it is part of a wider renovation, go straight to the 8-yard maxi rather than book twice.

Capacity35–45 bin bags Heavy wasteRated for it

Every job varies - if yours is bigger or smaller than typical, the skip calculator asks four quick questions and gives its own recommendation.

What typically goes in the skip

  • Kitchen units and cabinets
  • Worktops
  • Old flooring and underlay
  • Wall and floor tiles
  • Sink and taps
  • Packaging from new appliances

What to watch for

Old appliances (ovens, fridges, dishwashers) are electrical items and need declaring separately - they cannot go straight in with general waste. Tell us what you are replacing at booking and we will confirm the right way to include or collect them.

Check specific items

Search anything else →

Related guides