Skip Hire for a Kitchen Renovation
A kitchen renovation usually needs a 4 yard midi skip. It takes the units, worktops, flooring and tiling a standard refit produces, with enough room left for packaging from new appliances - a full-house renovation that includes the kitchen is the main case where you would size up to an 8-yard instead.
4 Yard Skip (Midi skip)
Kitchens generate a mix of bulky-but-light waste (cabinets, worktops) and heavier material (tiles, old flooring), which is exactly what a midi is sized for. If the job is only a partial refit - new worktops and appliances, cabinets staying - a mini is often enough; if it is part of a wider renovation, go straight to the 8-yard maxi rather than book twice.
Every job varies - if yours is bigger or smaller than typical, the skip calculator asks four quick questions and gives its own recommendation.
What typically goes in the skip
- Kitchen units and cabinets
- Worktops
- Old flooring and underlay
- Wall and floor tiles
- Sink and taps
- Packaging from new appliances
What to watch for
Old appliances (ovens, fridges, dishwashers) are electrical items and need declaring separately - they cannot go straight in with general waste. Tell us what you are replacing at booking and we will confirm the right way to include or collect them.